Experience of the Company Since its Establishment

LABA CONTRACTORS LTD has 12 years since establishment dealing with various local and international companies in providing laborers in constructions sites in civil and building works. The company is recognized by key stakeholders for providing first-class multi-disciplinary services.

The following are the corporate client enjoyed the service provided by our company:

1.Name of Client: Strabag International 

Project: BRT Project

Year: 2012-2016

Work:Provision of Skilled and unskilled laboures (400 laboures)

PIECE WORK (PRODUCTION RATE)

I. Setting of paving blocks 1000m2  II.Manual excavation of drainage 170m
long open and underground III. Disilting of existing old sewage system
Kariakoo area IV.Demolition of structure by using compresor V.Culvert Pipe lying VI.Kerbstone works VII.Slope protection VIII. Bollard installation
X.Manual excavation XI. Manual levelling XII. Asphalt works XIII. Loading to spoil unsuitable materials XIV.BRT Crack pavel breaking XV.Manhole .

Among of the BUS terminal constructed in BRT project, executed by STRABAG INTERNATIONAL,where LABA CONTRACTORS LIMITED hired by STRABAG to supply 400 laborers both skilled and unskilled to execute work in various sections,The project executed in 2012 to 2016 in Dar es SALAAM Tanzania.

2.Name of  the Client:BAM International

Project:Airport Terminal III

Work Description:Provision of Skilled and unskilled laborers (300 laborers)

Year:2014-2016

PIECE WORK (PRODUCTION RATES)
I.Rebar fixing 1500 tones II.Screding work III.Culvert pipes line IV.Plastering work V.Block work

The front view of the Julius Nyerere International Airport Terminal 3 where LABA CONTRACTORS LIMITED hired by BAM International to supply 300 laborers both (Skilled and Unskilled) for the execution of the project in various units.The project executed in 2014 to 2016 in Dar es Salaam Tanzania.

 

3.Name of the Client:Sumitomo Mitsui Construction Co limited

Project: Tazara Flyover Project

Year: 2016 to the end of project

Description of the Work:Provision of skilled & unskilled
laborers (350 laborer) in:

I.Still fixing II. Carpentry III.Masonry IV.Scaffolding V.Welding VI.Safety team
VII.Helpers in various sections VIII.laboratory assistance IX.Chain man X.Concrete laying XI. Grease man XII.Stores XIII.Garden XIV.Workshop

The Aerial view of Tazara Flyover,where LABA CONTRACTORS LIMITED contracted by SUMITOMO MITSUI Construction LTD to supply 350 labourers both skilled and unskilled for the execution of the project in various department.The project took place in 2016.

4.Name of the Client: Nyanza Road Construction limited

Year:2016

Description of the Work:Civil Work

I.Box culvert Construction II.Base Course and asphalt laying III.Open drain 8000m road IV.Grouted stone pitching 250m2 V.Heavy gravelling 4km VI.Replace damaged gabions 50m3 VII.Drainage VIII.Cross and access culvert
IX.Spoon drain protection X.Line ditch XI.Sleeve duct XII.Gabion works
XIII.Stone pitching

5.Name of the Client:Rockwell

Project:New Airport terminal III

Year:2016

Description of the work:Installation of Electric and Network in Airport Terminal III

Work:Provision of Skilled and Unskilled laboures for Networking and Electrical works.

6.Name of the Client:China Civil Engineering and Construction Company(CCECC)

Project:Ubungo Flyover

Year:2018-2019

Description of the work:Provision of Skilled and Unskilled Labour in:

Still fixing,Carpentry,Masonry,Scaffolding,Welding,Safety team,Helpers in various sections,laboratory assistance, Chain man, Concrete laying , Grease man, Stores,Garden,Workshop

 

Above is Ubungo Flyover which was constructed by CHINA CIVIL ENGINEERING AND CONSTRUCTION COMPANY(CCECC),where LABA CONTRACTORS LIMITED hired to supply Skilled and unskilled labour in various unit.The project took place in 2018 to 2019.

7.Name of the Client:Mberg CO.LTD

Project:Construction of New Salender Bridge

Year:June 2019 to December 2019

Description of the Project:Construction of Temporary Bridge and Provision of Labour

 

8.Name of the Client:Roman Cothoric Church(Segerea)

Project:Demolition and Construction of Father’s House

Year:2021

Project Description:Construction of Father’s House

9.Name of the Client:Tanroads-Tanga Region

Year:2015-2017

Project:Civil works

I.protection drainage works 200m2 II. Concrete pipe culverts 900m-10m
III. Grass cutting 600,000m2 IV.Re-slope paved /unpaved shoulder
V.Excavate drains 3000m3 VI.Vegetation control 15,030m2 VIII.Heavy graveling 4km IX.Graveling within FHD 1000m3 XI.Replace damaged gabions 50m3

10.Name of the Client:Tanzania Rural and Urban Roads Agency (TARURA)

Year: 2022

Project: Civil Works

Project Description:

Routine Maintanance of Nyundo-Narunga-Ziwani-Njegwa Road,Migombani-Naucheche-NyundoRoad,Mbambakofi-Nanjedya-Hinju Road,Nanyamba-Migombani-Ngumanya Road,Namisangi-Mkutimango-Namambi Road,Namisangi-Majengo-Njengwa-Nangawaza-Ziwani Road,Lindi Boarder-Nahukula- Road,Namisangi-Mkutimango-Namambi Road,Namisangi-Majengo-Njegwa Road,Spot Improvement of Migombani-Naucheche-Nyundo Road,Mbambakofi-Nanjendya-Hinju Road,Nanyamba-Migombani-Ngumanya Road,Njengwa-Nangawanga-Ziwani Road and Contruction of Ditch Linning 200M along Migombani-Naucheche-Nyundo.

11.Name of the Client:Tanzania Rural and Urban Road Agency

Year:2022

Project Description:

Routine Maintanance of Ruangwa-Mkutingome Road 4km,Ruangwa-Liuguru Road 4Km,Likunja-Chikoko Road 8km,Ruangwa-Nandenje Road 5km and  Naunambe-Namungo Road km 6.Culvert construction(1c) along Narungombe-Liuguru Road and Culvert repair(1c) along Ruangwa-Liuguru Road in Ruangwa DC.

12.Name of  the Client:Tanzania Rural and Urban Roads Agency(TARURA)

Year:2022

Project Description:

Routine Maintanance,Periodic Maintanance of KM 11 Along Nambunga-Mkoma 1

13.Name of Client:Tanzania National Road Agency.

Year:2018

Project Description

Routine and Recurrent maintanance works labour base on Road sides along korogwe-Handeni[KM+00-KM 30+000

 